Quality Requirements
Quality Tree
The following quality attributes are critical for the success of the 1+MG Node.
| Quality Attribute | Priority | Motivation |
|---|---|---|
| Security | Critical | Handling sensitive genomic data requires strict adherence to GDPR and National Laws. |
| Interoperability | High | The system must function within a European Federation (27+ countries). |
| Usability | High | The application process must be transparent for researchers. |
| Performance | Medium | Discovery queries should be interactive; Compute jobs can be batch/long-running. |
Quality Scenarios
These scenarios map to the Sequence Diagrams in the Runtime View.
QS-01: Secure Computation (Security)
- Scenario: A researcher executes a workflow on sensitive data.
- Stimulus: Submission of a WES request.
- Response: The system verifies the GA4GH Passport. The compute node has NO internet access. Data is encrypted at rest.
- Measurement: No data exfiltration possible. Compliance with "Five Safes".
- Link: Runtime View -> Secure Processing Workflow
QS-02: Cross-Border Discovery (Interoperability)
- Scenario: A central query is distributed to 27 national nodes.
- Stimulus: "Does any node have BRCA1 variants?"
- Response: All nodes respond with a count (or error) within 10 seconds.
- Measurement: 95% success rate. Standardized Beacon v2 response format.
- Link: Runtime View -> Data Access Workflow
QS-03: Data Sovereignty (Compliance)
- Scenario: Additional data access restriction (Veto).
- Stimulus: A valid Central DAC approval is received by a National Node.
- Response: The National Node (Data Holder) re-evaluates the request against local law and may Veto the access.
- Measurement: Access is DENIED locally despite Central approval.
- Link: Runtime View -> Data Access Workflow
QS-04: Operational Compliance (Maintainability)
- Scenario: New staff member joins the Node.
- Stimulus: Onboarding process initiation.
- Response: Staff is trained on "EU-wide SOPs" and "Node-specific SOPs" within 2 weeks. Training is recorded.
- Measurement: 100% of staff have valid Training Records (Annex 1 of MS13).
- Link: Building Block View -> Management Zone
QS-05: Service Management (Compliance)
- Scenario: Annual Compliance Assessment.
- Stimulus: Audit by GDI Operations Committee.
- Response: The Node demonstrates adherence to FitSM standards and has a valid "Compliance Assessment Report".
- Measurement: 0 Major Non-Conformities.
- Link: Risks -> TR-02 Compliance Maturity